Flint House Renovation
This was a challenging project. Creating two new window openings in a Grade 2 listed building. With two foot thick walls. It was completed, however, and you can see the before, during and after photographs on Instagram. The build took place in the summer of 2020 squeezed between Covid Lockdown 1 and Lockdown 2 after […]